| Alignment Study for the Replacement of LaGrange Lock Toby Hunemuller, P.E. Team Leader –Rock Island District & William Miles, P.E. Director of Civil Works Bergmann Associates |
Design and Construction of the New Orleans Interim Closure New Orleans Interim Closure Structures Darryl C. Bonura, P.E. Barry D. Fehl, Barry D. Fehl, DSc, P.E., Anthony Goodgion, P.E. URS |
Charleroi Locks Replacement–
Stabilization of Existing Lock Walls
For Construction of New Middle Wall Brian McFarland, Project Engineer -U.S. Army Corps of Engineers Tim Hampshire P.E., Structural Engineer –DLZ National Inc. |
Chickamauga Lock Segmental Landward Cofferdam John C. Schirmer, P.E. - Bergmann Assoc. Sam X. Yao, Ph.D., P.E. - Ben C. Gerwick, Inc. |
| Howard Hanson Dam Additional Water Storage and Fish Passage Facility Project Phase 1: Cofferdam and Excavation INCA Engineers, Inc. |
IHNC Presentation FIP vs. CIP Construction Alternatives John D. Clarkson, P.E. Charles Laborde, P.E. |
Damage Investigation And Rehabilitation Damage Investigation And Rehabilitation
Of The Of The Regulating Outlet Works Tunnel Floor Damage Regulating Outlet Works Tunnel Floor Damage - Seven Oaks Dam, Santa Ana River, California David Cozakos, SPL, William Halczak, SPK, Robert Kwan, SPL Mark Sawka, NWP, Steve Schlenker, NWP |
Lower Monumental Lock Rehabilitation Study USACE - Walla Walla District |
| McAlpine Lock Replacement Project Kathy Feger, P.E. McAlpine Project Engineer for Design Louisville District, USACE |
Upper Mississippi River Locks Typical & Transitional Lock Wall Monoliths Fred R. Joers, P.E. - Chief, Structural Engineering - Rock Island District, USACE, Brian Twitchell, P.E., Project Engineer - INCA Engineers, Inc., Steven M. Hobbs, P.E., Structural Engineer - St. Louis District, USACE, Lisa Pierce, P.E. Navigation Group Manager - INCA Engineers, Inc. |
Marmet Lock
Upper Guide & Guard Wall Post-Tensioned Concrete Box Beams Jeff Maynard, P.E., Structural Engineer - Huntington District, USACE Lisa Pierce, P.E. & Amir Asaidali, P.E., Project Managers - INCA Engineers, Inc. |
New Innovative Tool for Predicting and Optimizing the Extension of Service Life for Critical Concrete Infrastructure Ron Heffron, P.E., Moffatt & Nichol |
| Montgomery Lift Gates | Fatigue Analysis of Moveable Bridges Gabriela M. Lyvers, P.E. |
Louisville's Big 4 Bridge USACE - Louisville District |
Chesapeake City Bridge Crack Study Adrian Kollias, P.E. USACE Philadelphia District Bridge Program Manager |
| A Data Management System for Miter Gate Strain Monitoring –Greenup Lock and Dam Chris Bogen, Ph.D. & Bruce Barker Information Tecnology Laboratory, ERDC-USACE and Doug Kish, USACE Huntington District |
The Importance of Dynamic Analysis Jeff Ament, P.E. USACE - Portland District |
Numerical Evaluation of Stress Intensity Factors: J-Integral Approach Guillermo A. Riveros, Ph.D., P.E. Information Technology Laboratory - ERDC |
Structural Load Experiments and Remote Monitoring to Evaluate Structural Integrity of Tainter Gate Anchorage Systems Bruce Barker and Dan Eng, ERDC ITL, Vince Chiarito, ERDC GSL, Mark McVay, Tulsa District |
| Old Hickory Lock & Dam Spillway Tainter Gate Repair Mike Carney, P.E. and Cory Morgan, P.E. |
Mitergate Design Issues Mike Carny, P.E. Senior Structural Engineer INCA Engineers, Inc. |
||