All Presentations are in PDF Format.
Metering of Army Facilities
Charles W. Holland, Charles W. Borders and
Kenneth L. Arrington
Putting your UMCS on the LAN:
The Challenge to Provide Networthiness Documentation to the DOM

Will White and Joe Bush
BACnet® and LonWorks® Technology Comparison and Status
Dave Schwenk
Condition Monitoring of Lock Structures
Ashok Kumar and L.S. Stephenson
Green Chemical Treatments for Heating and Cooling Systems
Susan A. Drodtz and Vincent F. Hock
Facility Mechanical Design Using BIM
Brandon T. Martin
Grand Forks, NDEast Grand Forks, MN Pump Stations
Tim Paulus
Major Repair of Hydraulic Steel Structures
Michael G. Scott and Marvin L. Parks
HVAC Testing, Adjusting, Balancing and Commissioning
John Hamilton TABB
Cathodic Protection forAbove GroundStorage TanksCathodic Protection forAbove GroundStorage
Mark T. McNamara, P.E.
Lower Monumental Lock and Dam Navigation Lock Rehabilitation Report
Kevin Renshaw, P.E.
LonWorks® System Planning: Creating an Implementation Plan
Joe Bush
1. Pump Stations - Lessons Learned During Construction
2. Lessons Learned for Axial/Mixed Axial/Mixed Flow Propeller Pumps
3. Inspection of Mechanical and Electrical Equipment for Levees
All Presentations by Mark Robertson, P.E.
Ice-Free Cathodic Protection Systems for Elevated Water Storage Tanks in Cold Climates
and
Sensors to Improve Corrosion Control & Water Quality in Water Distribution Systems
Vicki Van Blaricum & Vince Hock and James Bushman & Bopinder Phull
CORROSION PREVENTION OF ASSETS STORED IN EARTH COVERED MAGAZINES USING ELECTRO-OSMOTIC PULSE TECHNOLOGY
Orange S. Marshall, Michael K. McInerney, and Sean Morefield
S-331 Command & Control Center: Remote Operation and Monitoring of Multiple Pump Stations
John H. Helberg, P.E.
The Automation of a Hydropower Plant
Steven S. Rose. P.E.
Procurement Strategy for Small and Large Pumping Equipment
Shashi Makker, SAJ
Gerald DeLoach, SAJ
Redesign of Tainter Gate Trunnion Bearings Tuttle Creek Lake: Manhattan, KS
Michael G. Scott
Open Systems DDC Implementation: How to meet the Challenge to Integrate Multiple Vendor Building Systems
Chris Newman
New Generation Turbine Oils:
For Better or Worse
Al Beitelman
High Pressure Bonneted Slide Gates for CUP McCook Reservoir Distribution Tunnel System High
Hassan Tondravi, P.E. and Henry Stewart, P.E.
R-22 Phase Out: Facts for a Smooth TransitionR-22 Phase Out: Facts for a Smooth Transition
Jeff Moe
Cathodic Cathodic Protection as a Means to Protection as a Means to Protect Our Nation Protect Our Nation’s Infrastructure s Infrastructure
James T. Lary

Lessons Learned from Modeling and Simulation of Airflow and Airborne Contaminant Dispersion in Buildings
Dr. William J. Croisant, P.E.

Water-Lubricated Axial Lubricated Axial-Flow Flow
Pumps Pumps- Ten Years of Ten Years of
Success for Jacksonville Success for Jacksonville
District

Stanley Pilinski, P.E.